Health Facilities

B&A has provided engineering services for different health facilities throughout Southern California.



Simi Valley Hospital

Simi Valley, CA

B&A provided a Design Electrical Power for New Chiller Installation

The Simi Valley Hospital wanted their existing 100-ton chiller to be removed and to install a new 50-ton chiller. B&A provided electrical design documents in sufficient detail for OSHPD approval and contractor installation of the power to the new 50-ton chiller.

Powered by: Nichetech